
Master Bathroom Renovation
Completed full master bathroom remodel: curbless walk-in shower, Schluter Kerdi waterproofing, 12x24 porcelain floor, freestanding tub, double vanity with quartz.

Hicksville, Nassau County
Local bathroom remodels, walk-in showers, and full gut renovations for Hicksville homeowners. Schluter-Certified waterproofing. Nassau permits pulled in-house. 4.9★ from 163+ Long Island reviews.
On-site quote, firm number, no high-pressure sales. Response within 1 business day.
Licensed & Insured
Nassau County & Suffolk
NKBA Certified
Certified Bath Designer
4.9 / 5.0
163+ reviews
640+ Bathrooms
Since 2012
Serving Hicksville
Hicksville was largely built out in the 1950s–1970s — split levels, ranches, colonials with the original hall bath and master still in place on many blocks. We know the framing, the plumbing era, and what surprises to expect behind the tile (cast iron drains, galvanized supply, occasional framing rot at the tub wall plate).
On a typical Hicksville bathroom remodel we pull a Nassau County permit, strip the bathroom to studs, replace the drain stack with PVC and supply with PEX, waterproof with Schluter Kerdi or Kerdi-Board, and rebuild with modern tile, vanity, and fixtures. Most Hicksville hall baths finish in 3–4 weeks.
We've completed dozens of Hicksville bathrooms over the past decade. Common requests: tub-to-shower conversions for aging homeowners, master bath expansions into closet space, full kid-bath refreshes with slip-resistant tile.
Hicksville sits under the Town of Oyster Bay's permit jurisdiction. The TOB Building Department processes bathroom permits on a standard timeline — typically 7–12 days from application to permit-in-hand for a straightforward plumbing-and-electrical scope. We file digitally, follow up directly with the inspector's office, and schedule your rough inspection the day after framing and rough plumbing are complete. The final inspection closes your permit record, which is exactly what Nassau County real estate attorneys want to see at closing.
Cost range for Hicksville bathrooms: hall bath full gut with tub-to-shower conversion runs $10,000–$20,000. Master bath renovation with walk-in shower, double vanity, and heated floor: $22,000–$42,000. Powder room update (no relocation): $4,500–$9,000. Accessible bath build with curbless shower, fold-down bench, and ADA hardware: $14,000–$30,000. Every quote is firm and in writing.
Looking for a broader view of bathroom remodel options across Long Island? Our full guide covers costs, timelines, and the process we follow from Huntington to Hicksville. Or see all Nassau County bathroom renovation areas we serve.

Service zip codes
11801 · 11802 · 11815
Approximately 20–40 minutes from our Mineola studio.
What we've learned in Hicksville
Original Hicksville colonials have a cast iron tub on a wood-framed second floor. Those tubs weigh 350+ pounds empty. If you're converting to a shower, we often find framing that was never quite right — we inspect, sister joists if needed, and move on with the rebuild.
Nassau County's bathroom permit process is straightforward once you know the inspector's preferences. We file digitally, schedule rough and final inspections in-sequence, and you never need to call the county.
Hicksville school buses run heavy on Old Country and Jerusalem Ave. We schedule demo-day trucks outside school start/end windows so neighbors stay happy and we stay productive.
Original Hicksville plumbing is cast iron drain stacks — they last 50+ years but when they fail, they fail hard. During a full remodel we always replace the in-wall drain section with PVC. One extra day of labor, lifetime reliability.
Live Job Log
Real Nassau County bathroom projects completed in the last few months.

Master Bathroom Renovation
Completed full master bathroom remodel: curbless walk-in shower, Schluter Kerdi waterproofing, 12x24 porcelain floor, freestanding tub, double vanity with quartz.

Tub to Shower Conversion
Tub-to-shower conversion in Hicksville colonial: pulled cast iron tub, rebuilt framing, Kerdi-Line drain, large format porcelain tile, frameless glass.

Full Bathroom Remodel
Full gut remodel in 1960s Huntington cape: new plumbing rough-in, Schluter Ditra underlayment, herringbone marble floor, shaker vanity.

Accessible Bathroom Remodel
ADA / aging-in-place remodel in Smithtown: curbless shower, grab bars, comfort height toilet, slip-resistant porcelain, wider 36" doorway.

Walk-In Shower Installation
Walk-in shower install in Massapequa hall bath: Kerdi-Board walls, linear drain, Calacatta subway tile, bench seat, thermostatic valve.

Shower Renovation
Shower renovation in Commack: new Schluter pan, rebuilt shower curb, mosaic floor, subway walls, brushed nickel trim kit.

Master Bathroom Renovation
Master bath remodel in Great Neck: relocated plumbing for freestanding tub, double vanity, floor-to-ceiling tile, Nassau permit pulled.

Bathroom Tile Installation
Full bathroom tile installation in Levittown: 24x48 large format walls, herringbone floor, schluter profile edge trim.
Services in Hicksville
Hicksville homeowners
Angela's team gutted our 1970s hall bath and turned it into a spa. Zero-threshold shower, Schluter waterproofing, linear drain, perfect tile lines.
Jennifer M.
Hicksville, NY · Full Remodel
Tub to shower conversion in our 1960s Hicksville colonial. Pulled cast iron tub, rebuilt framing, Kerdi-Line drain, large format porcelain.
Chris N.
Hicksville, NY · Tub to Shower
Tile install Hicksville: wood-look porcelain floor, 12x24 walls, Schluter-Jolly edge profiles, herringbone shower niche accent.
Marco T.
Hicksville, NY · Tile Install
Questions from Hicksville
Most bathroom renovations in Hicksville fall into three tiers. A guest bath or hall bath refresh (tile, vanity, fixtures, no plumbing moves) typically runs $8,000–$18,000. A full hall bath gut-and-rebuild with tub-to-shower conversion lands at $14,000–$28,000. A master bath renovation with double vanity, walk-in shower, and heated floor is usually $30,000–$60,000 depending on fixture selections and stone. Accessible bath builds with zero-threshold shower, grab bar blocking, and ADA hardware run $15,000–$35,000. We give firm, itemized written quotes after an on-site walk.
Nassau County Building Department requires a permit for any project involving plumbing relocation, electrical upgrades, or structural changes (moving a wall, enlarging the bathroom footprint). Cosmetic refreshes — tile only, vanity swap, fixture replacement with no pipe moves — typically don't need one. We pull the permit on your behalf, coordinate all inspections, and deliver a closed permit card at job completion. This matters for your homeowner's insurance and for resale.
Our current backlog runs 6–10 weeks from contract signing to crew start. If you have a hard deadline — a relative moving in, a home sale, a contractor window — tell us at the estimate stage and we'll do our best to sequence accordingly.
Yes — Island Bath Studio serves all of Nassau County from our Mineola studio. Hicksville is well within our regular service area and we've completed projects there routinely. No trip fees within Nassau County.
Standard hall bath full gut-and-rebuild: 3–4 weeks. Master bath renovation: 4–6 weeks. Tub-to-shower conversion only (no full gut): 2–3 weeks. Shower-only tile rebuild: 2–3 weeks including frameless glass. Accessible bath retrofit: 3–4 weeks. Timeline starts the day the permit is in hand.
Yes. Island Bath Studio holds Nassau County HIC License #H2419300 and carries $1,000,000 General Liability plus Workers' Compensation. We are also NKBA Certified and EPA Lead Renovation Certified. We provide our license number and certificate of insurance before any contract is signed.
Hicksville falls under the Town of Oyster Bay Building Department. Any bathroom project involving plumbing relocation, electrical work, or structural framing changes requires a TOB permit. The Town of Oyster Bay typically processes residential bathroom permits in 7–14 business days from submission. We handle the full permit application — drawings, scope description, fee payment — and coordinate both the rough inspection (after plumbing and electrical rough-in) and final inspection (after tile and trim). You don't touch the paperwork.
Bathroom renovation costs in Hicksville follow Nassau County norms. A hall bath full gut-and-rebuild with tub-to-shower conversion — Schluter waterproofing, new PVC drain, PEX supply, porcelain tile, vanity, fixtures — typically runs $10,000–$20,000. A master bath renovation with walk-in shower, double vanity, and no plumbing relocation lands at $22,000–$42,000. Powder room refreshes run $4,500–$9,000. Accessible bath builds with zero-threshold shower and ADA hardware run $14,000–$30,000. We provide a firm written quote after an on-site walk — no ranges-until-you-sign business.
For most Hicksville hall baths and master baths, large-format porcelain is the right call — 12×24 on walls, 12×12 or 3×6 mosaic on the floor. Porcelain is non-porous, handles Long Island's seasonal humidity without swelling or cracking, and never needs sealing. Wood-look porcelain planks are very popular right now on Hicksville bathroom floors: warm visual, zero maintenance, safe wet-use with the right slip rating. If you want stone — marble or quartzite — we install it with Schluter Ditra uncoupling membrane under the floor tile and penetrating sealer applied in-house at install.
A full Hicksville hall bath gut-and-rebuild typically runs 3–4 weeks from crew start to final walkthrough. Master baths with plumbing relocations or custom stone work run 4–6 weeks. Tub-to-shower conversions without a full gut take 2–3 weeks. Add 7–14 days before crew start for the Town of Oyster Bay permit, which we file immediately at contract signing. Your total calendar from 'we agreed on price' to 'bathroom is done' is usually 5–7 weeks for a standard hall bath project. We build all of this into the schedule in writing.
Yes, and we recommend it on every full remodel in Hicksville homes built before 1985. Original cast iron drain stacks hold up for decades, but by the time a Hicksville home is 50–70 years old, the section running through the wall cavity to the main stack is often starting to corrode from the inside. During a full gut remodel we replace all in-wall drain sections with schedule-40 PVC as standard practice — it adds about half a day but eliminates the risk of a drain failure inside a freshly tiled wall. We show you the old cast iron section before we haul it away.
Ready when you are
Free on-site estimate. Firm quote within 48 hours. No high pressure, ever.
640+
Bathrooms Completed
4.9★
163 Google Reviews
1 day
Callback Window
On-site quote, firm number, no high-pressure sales. Response within 1 business day.